Continuous insulation, tight joints and furred out

Mineral wool or rigid foam board over the air barrier, fastened to the schedule and furred out for a drained cavity behind the cladding.

Continuous insulation boards on a multifamily wall

Continuous insulation covers the studs, plates and slab edges that cavity insulation can't. It cuts thermal bridging and keeps the sheathing warmer, which lowers the risk of condensation in cold weather. It only performs if the boards run tight. Gaps at joints, corners and openings are thermal bridges of their own, so we cut boards to fit, stagger joints and fill voids before anything covers the wall. Slab edges and rim boards get covered the same way as the field of the wall, so the floor lines stop acting as cold spots.

Board goes on over the air barrier we install. We fasten it with the fasteners and spacing your spec calls for, then add PT furring through the insulation into the framing to carry the cladding and form a drainage cavity. Rough openings get extended to the new wall depth and flashed. Common systems include Rockwool, Owens Corning and Kingspan. We install the product in your spec, and we follow the tested assembly where code requires one. Each step gets photographed for your super.

Pricing is by the square foot at each board thickness, with furring and opening extensions broken out by the linear foot. We bill bi-weekly by percent complete and provide certificates of insurance before mobilization. One foreman stays on site, sends a daily progress report and photographs each layer before it gets covered. Framing, roofing, dumpsters and general site cleanup are by others. Quantity changes bill at the same unit rates as the base contract. Installed quantities are tracked by board thickness and elevation, so your percent complete matches the wall.

What's in our scope

  • Mineral wool or rigid foam board over the air barrier
  • Single or multiple layers with staggered joints
  • Board seams taped where the spec calls for it
  • PT furring fastened through to framing
  • Rough openings extended to the new wall depth
  • Flashing and insect screen at the cavity edges
  • Cladding attachment coordinated with the board thickness

What we check before it gets covered

  • Boards tight with joints staggered
  • Fastener type, length and spacing to the spec
  • Voids at corners and openings filled
  • Furring plumb, in plane and into framing
  • Opening extensions flashed into the barrier
  • Each elevation photographed before cladding

What we need to bid

Drawings, specs, the product submittals if you have them, your schedule and the bid due date. You get unit pricing back, line by line.

Popular continuous insulation brands

These are the lines most people ask us about. We install the product in your spec.

What you get on your site

01

Dedicated foreman

One person runs our crew on your site every day and answers to your superintendent.

02

Daily reporting

Progress reported every day. Any delay in material, access or weather gets flagged right away.

03

OSHA staging

Staging, ladders and fall protection set up per OSHA before work starts.

04

Nothing buried

Damage or a bad substrate gets photographed and priced before it's covered.

05

Scope in writing

Inclusions and exclusions listed line by line. Dumpster and general site cleanup are by others unless added to the scope.

06

Punch list closed

Final walkthrough with you, and the punch list signed off before we demobilize.

Questions GCs ask

Mineral wool or foam board?

That's set by the design. Mineral wool is noncombustible and vapor open. Foam boards give more R-value per inch, and foil-faced versions are vapor closed. Fire testing, wall thickness and drying direction all play into the choice. We install the material in your spec and flag any conflicts with the cladding attachment during submittals.

How is the cladding attached through the insulation?

Usually with PT furring screwed through the insulation into the framing, using fasteners sized for the board thickness and the cladding weight. Some specs call for clips or rails instead. We follow the detail on the drawings and the fastener schedule in the product data, and raise any question about embedment before we start.

Do thicker boards change the windows?

Yes. When the wall gets deeper, the window has to be set to the right plane, and the opening needs extension jambs or bucks that are flashed into the air barrier. We handle that as part of our scope, so the window, the barrier and the extension tie together without a gap between trades.

Does the insulation need taped seams?

Only if the spec makes it part of the air or water control. Some designs use taped foam board as the drainage plane. Others put the air barrier on the sheathing and treat the insulation as thermal only. We install to the design and check that every taped joint is clean, pressed down and lapped correctly.

The rest of the envelope

Brazilian roots.New England weather.

4Ever has Brazilian roots. The jaguar, the biggest cat in the Americas, carries that origin onto every truck, shirt and yard sign. Yellow is its coat. Black is its spots.

It stands for what we want on every wall we close: strength that holds for decades and precision you can check with a level.

  • StrengthMaterials and fastening that last decades.
  • PrecisionMeasured, flashed, taped and sealed.
  • ResilienceBuilt for wind, snow and freeze thaw.
  • TrustWritten scope and insured crews.
  • BrazilWhere the jaguar comes from.

Build your quote.Start a bid.

Four quick steps. A real person from our office calls you back.

Who is this for?
What do you need?

Pick as many as you want. Looking for work? See jobs on our crews.

Tell us about the building.

How tall is it?

When do you want to start?

Where do we call you?

By sending this you agree that 4Ever Exteriors may call, text or email you about your project. No spam, no sharing your number.

New England colonial home with charcoal siding, white trim and a composite deck at sunset Multifamily building in progress with 4Ever crews on site

Get a written quotewith every itemspelled out.

Send the drawings.Get unit pricingback, line by line.

Call Free quoteRequest a bid